Port Augusta City Council – Heavy Duty Containment Boom Case Study

Heavy duty XR5 containment boom separating oil and grease in waste transfer pond at Port Augusta facility.

Project: Heavy Duty Containment Boom (XR5 Fabric)Client: Port Augusta City CouncilApplication: Waste Transfer Facility – Oil & Grease Separation The Challenge Port Augusta City Council required a containment solution to separate heavy oils and grease from a waste transfer pond. The pond receives discharge from trucks, resulting in: The objective was to isolate the top …

Read more

City Wide Detailing – Relocatable Vehicle Wash Mat Case Study

Custom 10m x 5m relocatable vehicle wash mat deployed at City Wide Detailing facility.

Client: City Wide DetailingSystem Supplied: Custom 10m x 5m Relocatable Wash Mat Operational Requirement City Wide Detailing required a compliant washdown solution that could be relocated when they moved premises. A permanently installed wash bay was not suitable due to the temporary nature of their site lease. They needed a contained wash area that would: …

Read more

Marine Containment Boom Installation – McConnell Dowell

350 metre marine containment boom deployed during bridge construction project.

Project: 350m Marine Containment BoomClient: McConnell DowellSector: Major Infrastructure / Marine ConstructionLocation: Australia The Challenge McConnell Dowell required a 350-metre floating containment boom to manage floating debris and potential hydrocarbon contamination during marine construction works. The system needed to: Time was critical, and incorrect specification would risk compliance exposure and project delays. The Trade Enviro …

Read more

What Our Clients Say

“We are very happy with the service and product provided. Delivery was on time and the backup service couldn’t be faulted. I would most certainly use Trade Enviro again.”

Luke Hillery
Hillery Group

“Fantastic service and very quick turnaround. This is the second lot of bunds we’ve purchased and we cannot fault the service or product.”

Ben English
Atlas CEA

“A pleasure to deal with from quote stage right through to delivery. You’re fully informed throughout the process.”

Garry Solly
McMahon Services

Recent feedback from projects involving wash bays, bunding, spill response and marine containment.